Research
On-device research index

arXiv research

A locally-built, LLM-digested index of recent arXiv papers in quant finance, geometry/topology, and statistical ML — keyword search served straight from SQLite on this machine.

168,657 papers · 148 categories

Trend · papers per month

0111 · Apr 201819922001200920172026
6 results for Rescheduling

Bayesian method optimizes rescheduling for multipurpose batch processes with incomplete look-ahead information.

problem Optimizing rescheduling for multipurpose batch processes under incomplete look-ahead information.
method Proposes a Bayesian dynamic scheduling method that learns from disturbances and updates schedules online.
result Achieves statistically better long-term costs and system nervousness compared to existing periodic rescheduling strategies.

Study analyzes how discounts affect train ticket purchases and rescheduling in Switzerland.

problem Understanding how discounts influence train ticket buying and rescheduling behavior.
method Machine learning techniques, including causal machine learning, to analyze survey data.
result Increasing a discount rate by 1% increases the rescheduled trip share by 0.16% among always buyers.

LineFlow is a framework for training RL agents to control production lines.

problem Designing control systems for production lines is challenging.
method Introduces LineFlow, an extensible Python framework for simulating and training RL agents.
result RL agents approach optimal performance in well-understood scenarios but face challenges in complex industrial lines.

Improved algorithm for adaptive dueling bandits with near-optimal regret bound.

problem Non-stationary dueling bandits with unknown number of preference changes.
method Elimination-based rescheduling algorithm for adaptive dynamic regret.
result Near-optimal ildeO(SextttCWT) ilde{O}(\sqrt{S^{ exttt{CW}} T}) dynamic regret bound.

In recent times, the manufacturing processes are faced with many external or internal (the increase of customized product rescheduling , process reliability,..) changes. Therefore, monitoring and quality management activities for these manufacturing processes are difficult. Thus, the managers need more proactive approa…

2018-04-05abs ↗pdf ↗